Countertop Installation
White-glove installation by our own employees. Most jobs completed in a single day, with seams matched to within 0.5mm. The same fabricators who shaped your countertop deliver and install it, protect your floors, control dust, and stay until the sink water runs clean.
Ready to start your countertop installation project?
What we do, and how it feels.
Installation is the day your kitchen comes together, and the day most shops cut corners. We don't subcontract it. Our own employees deliver, set, seam, and seal your countertop, protect your home throughout, and don't leave until the sink water runs clean. Most installs are finished in a single day.

The crew that built it is the crew that installs it.
- 1
Our own employees
No subcontractors, the same fabricators who shaped your top deliver and install it, so accountability never gets passed along.
- 2
Invisible seams
Seams matched and colour-blended to within 0.5mm, placed where they're least visible during fabrication layout.
- 3
Single-day installs
Most residential jobs are delivered, set, sealed, and cleaned in one day, you cook on it that evening.
- 4
Your home protected
Floors and cabinets are protected, dust is controlled at the source, and the site is left spotless.
Four calm steps, start to finish.
- 01
Final walkthrough
We confirm cabinet level, overhangs, and sink and cooktop placement before anything is set.
- 02
Protect & deliver
Floors and pathways are protected; your countertop is carried in and dry-fit into place.
- 03
Set & seam
Pieces are levelled, bonded, and seamed, colour-matched so the joint disappears.
- 04
Seal & clean
We seal where the material needs it, reconnect your sink, and clean every surface before we go.
A look at the work.



Homeowners, designers, and general contractors scheduling final countertop installation across Metro Vancouver and the Lower Mainland.
Trusted on projects like yours.
“Pacific Range templated on Monday, installed on Friday, and the waterfall seam is genuinely invisible. I've worked with five stone shops over the years, none this calm, clean, or accurate.”
“I spec Pacific Range on every custom home I build. They hit their dates, their seams are tighter than code, and their QC is above industry standard.”
Countertop Installation questions, answered.
Still wondering about something? Call us at (236) 885-6461. Real humans answer.
-
Do you use your own crew or subcontractors?
Our own employees, the same fabricators who shaped your top, deliver, set, seam, and seal it. Installation is never subcontracted, so accountability never gets passed along.
-
How long does installation take?
Most residential jobs are delivered, set, sealed, and cleaned in a single day, you can cook on the new countertop that evening.
-
How visible will the seams be?
Seams are colour-matched and blended to within about 0.5mm and placed where they're least visible, planned during fabrication layout so the joint disappears.
-
Will my home be protected during the install?
Yes. Floors, pathways, and cabinets are protected, dust is controlled at the source, and we leave the site spotless before we go.
-
Do you seal the countertop and reconnect the sink?
We seal where the material needs it, reconnect your sink, and don't leave until the sink water runs clean.
Schedule an installation window
Already have your countertop fabricated? Book an installation window and we'll handle the rest, cleanly, in a single day.

